Delivering Faster Turnaround Times with Smart Automation

Founded in 1958, Swan Electric Engineering Company expanded into sheet metal fabrication in 2007 to meet evolving customer demands. Today, the company stands out through its ability to deliver low-volume, high-mix production with turnaround times as short as 7 days — far ahead of the typical industry standard.

To maintain this speed while managing increasing production complexity, Swan Electric partnered with LVD Multifold India.

Keeping pace with constant engineering change

Operating in a high-mix environment means handling hundreds of part revisions every two weeks.

With a lean engineering and production team, Swan Electric needed a smarter way to manage frequent design updates while maintaining consistency and speed.

The goal was simple: improve efficiency, simplify change management, and continue delivering industry-leading lead times.

 

 

Smarter bending with ToolCell & CADMAN®

After first experiencing LVD Multifold technology in 2018, Swan Electric moved forward with implementing the ToolCell press brake automation system integrated with CADMAN® software in 2025.

The impact was immediate.

ToolCell and CADMAN® now help the team manage engineering changes more efficiently, streamline workflows, and maintain fast delivery times with greater productivity.

“CADMAN is the software that helps our design team cope with the volume of part changes and engineering changes that come our way.”
- Johan Benny Samuel, Executive Director, Swan Electric Engineering Company

Partnership beyond technology

Implementation was supported by LVD Multifold’s engineering team, working closely with Swan Electric operators and engineers to ensure a smooth transition and fast adoption.

Together, the teams created a solution built not only for today’s demands, but for future growth.

Watch the Customer Success Story